Home

Reference Materials

  1. 1907-01-01 Water Power Engineering (Mead)
  2. 1923-01-01 Hydro-Electric Power Stations (David Rushmore & Eric Lof)
  3. 1929-09-02 Simple Basis for Securing Efficient Hydro Operation (F. Nagler)
  4. 1933-04-01 Improved Type of Flow Meter for Hydraulic Turbines (I.A. Winter)
  5. 1940-12-02 Turbine_Efficiency_At_Safe_Harbor_(Mousson)
  6. 1949-01-01-PTC-18_Credits_Page
  7. 1949-01-01-PTC-18_Index_Test_Supplement_(ASME)
  8. 1950-01-01 Hydroelectric Handbook (Creager, Justin)
  9. 1951-01-01 Water Turbines excerpted from "Hydro-electric Engineering Practice (P.E. Deriaz)
  10. 1954-01-01 Selecting Hydraulic Reaction Turbines (USBR)
  11. 1954-01-11 Frequency_Response_Data_Presentation_Methods_(Rufus_Oldenberger)
  12. 1954-01-11 Optimum_Adjustment_of_Control_Loops_(Oldenburger)
  13. 1954-11-03_NEMA_Hydro_Erection_Standard
  14. 1955-07-01 Index_Testing_of_Hydraulic_Turbines_(Voaden)
  15. 1956-01-01 Speech_notes_(Voaden)
  16. 1957-08-01 NEMA Code.pdf
  17. 1963-05-01 Turbine_Testing_by_the_Gibson_and_Index_Methods_(USACE)
  18. 1966-10-05 The_Controlled_System_(M_Leum)
  19. 1967-10_Load_Reject_Study_(Mittendorf,Verna)
  20. 1968-6-27_Indexing_Pumps M. (Yamabe)
  21. 1976-11-01 Viktor Kaplan: Life and Work (H. Häckert)
  22. 1970-04_Corresponding_Kaplan_Data_Points_(Fay)
  23. 1977-06-17 Analysis_of_PID_Governors_in_MultiMachine_Systems_(Manitoba_Hydro)
  24. 1977-01-01 Estimating Reversible Pump Turbine Characteristics (USBR)
  25. 1977-01-01 Development of the Kaplan Turbine (Hanns G. Hansson)
  26. 1978-01-01 Woodward Rev-1 3-D Cam  (WGC)
  27. 1980-07-03_ITB_Pitch_to_Idaho Falls Power
  28. 1981-04-01 Governing_Kaplan_Turbines_for_Transient_Loads
  29. 1982-01-01 Field Testing Hydro Turbines (Lee Sheldon)
  30. 1984-09-01 Measurement_of_Real-Time_Turbine_Efficiency_(Erickson,Graber)
  31. 1986-01-14 BPA_Seeking_ITB_Demonstration_(Sheldon)
  32. 1986-03-24 ITB Field Test Report (Albright)
  33. 1986-03-24_EN20169_ITB_Field_Test
  34. 1986-03-26 ITB Detailed_Field_Test (Albright)
  35. 1986-03-27 Report on Index Test box (Dave Bishoff)
  36. 1986-04-01 Analysis of Clarence Cannon Data  (Sheldon)
  37. 1986-06-11 BPA to Corps (Myers)
  38. 1986-11-01 Checking Turbine Performance By Index Testing (Kirkland, Brice).pdf'
  39. 1987-02-01 Prime Times T-700
  40. 1987-03-01 Prime Times ITB
  41. 1987-06-01 Little Black Box for Index Testing (Albright)
  42. 1987-08-21 Optimisation of Bulb and Kaplan Turbine Runners (B. Velensek)
  43. 1987-09-01 PGE-PHP-2 (Bull Run) Test Report (Gary Hackett)
  44. 1987-12-01 PGE-PHP-2 Test Report (Terry Bauman)
  45. 1987-12-04_Analysis_of_PGE-PHP-2 Manual Test (Sheldon)
  46. 1988-05-28 PHP2 Classic Test (Sheldon)
  47. 1988-05-01 Kaplan Turbines: Design Trends (A. Lugarosi & A. Massa)
  48. 1988-08-01 Index Testing (Steendahl)
  49. 1988-08-01 Effect of Fish Diversion Screen on Turbine Efficiency (D. Lemon et al).pdf
  50. 1988-12-27 U.S. Patent# 4,794,544 (Albright & George Mittendorf)
  51. 1989-03-01 Prime Times ITB
  52. 1989-08-01 Determining Turbine Efficiency by Index Testing Hydro Review Tech Briefs (Sheldon)
  53. 1990-03-27 Evaluation of USACE's "automatic index testing device"  (Sheldon)
  54. 1990-04-01 Woodward did not use ITB technology
  55. 1990-04-01 History of USACE 3D Cam (various newspaper clips)
  56. 1991-01-01_IEC-41_Index_Testing_Winter_Kennedy
  57. 1991-06-01 Effects of Hydroelectric Turbine Passage on Fish Early Life Stages (Cada)
  58. 1993-01-01 Modern Errors in Winter Kennedy (Sheldon)
  59. 1995-01-01_Opt-Ease_Brochure (Sheldon)
  60. 1995-01-01_Optimization_Efficiency_of_Multi unit_Hydro Plants (Sheldon)
  61. 1995-08-25_Joint_Load_Optimization_(Dave_Kornegay)
  62. 1995-10-27 21st Century Advanced Hydropower Turbine System (Brookshire et. al.)
  63. 1996-01-01_IGHEM_Montreal_Experience_at_Index_Testing.pdf 
  64. 1996-10-01 Fish passage mitigation of impacts from hydroelectric power projects in the US (Cada)
  65. 1997_Oregon_Hydropower_Survey_(Reinhart et._al.)
  66. 1997-03-06_Shaken_Not_Stirred_Recipe_for_Fish-Friendly_Turbine (Cada)
  67. 1997-03-01 Development of Biological Criteria for the Design of Advanced Hydropower Turbines (Cada, Coutant)
  68. 1997-05-01_Sliding_Gate_Method_(Almquist, March & Franseen)
  69. (2013-01-01 Late Note: A FOIA for Sliding Gate data learned it didn't work.)
  70. 1998-01-01 U.S. Hydropower Resource Assessment for Illinois (Reinhart et al)
  71. 1998-01-01 Measuring the effect of Fish Diversion Screens (Lemon, Wittinger et al)
  72. 1998-06-01 Reviewing the Approaches to Hydro Optimization (Sheldon)
  73. 1999-07-01 Summary of Environmentally Friendly Turbine Design Concepts (Odeh)
  74. 1999-08-01 The Infinite Turbine (Janet Wood)
  75. 1999-12-01 It's Not Easy Being Green (March, Fisher).pdf
  76. 1999-01-01 Status_Of_U.S._Department_Of_Energy's_Advanced_Hydropower_Turbine_Systems_Program_(Sale, Cada, Reinhart, Sommers, Brookshier, Flynn)
  77. 2000-04-01 Tools for Environmental Monitoring and Response at Hydro Projects (Faulkner)
  78. 2000-04-25 Hydropower R&D: Recent Advances in Turbine Passage Technology (Brookshire, Reinhart, Cada)
  79. 2000-04-10 Tools for Hydro_Environmental_Monitoring_(Faulkner)
  80. 2000-12-04 BPA Completes GDACS @ McNary (BPA)
  81. 2001-01-01 Light-Emitting Tag Testing in Conjunction with Testing of the Minimum Gap Runner Turbine Design at Bonneville Powerhouse 1 (Carlson)
  82. 2001-06-16 Voith Siemens HydroPower Generation (Richard.Fisher VS-Hydro to NPCC)
  83. 2001-09-01 Development of Advanced Hydroelectric Turbines to Improve Fish Passage Survival (Cada et. al.)
  84. 2001-12-01_HydroPower_In_Norway Title Page.pdf
  85. 2001-12-01 Hydropower In Norway Mechanical Equipment (Arne Kjolle)
  86. 2001-01-01 Karun3 Damand Hydroelectric Power Plant (Arne Kjolle)
  87. 2002-04-01 Tools_For_Environmental_Monitoring_and_Response_at_Hydro_Projects
  88. 2002-01-01 Application of Biological Design Criteria in Kaplan turbines. (ORNL)
  89. 2003-03-01 Evolution of Sensor Fish Device for Measuring Physical Conditions in Severe Hydraulic Environments (T.J.Carlson et al)
  90. 2003-03-01 Regulatory Approaches for Dissolved Oxygen at Hydropower Facilities (ORNL Peterson et. al.)
  91. 2003-08-01 Optimizing_the_Corps_Hydroelectric_Generation_on_Columbia_River_(Wittinger)
  92. 2003-09-01 Identifying Effects on Fish of Pressure Changes during Turbine Passage (Becker, Abernathy Dauble)
  93. 2003-09-06 USACE ITB Solicitation #1 (HDC)
  94. 2003-09-12 USACE ITB Solicitation #2 (HDC)
  95. 2003-10-20_Software_Report (ATECo)
  96. 2003-10-20_Screen_Gallery (ATECo)
  97. 2003-10-24_AGCo_Claims_ITB.pdf
  98. 2004-05-26 USACE Contract W9127N-04-D-0009 for Type-1 Optimizer (Ebner)
  99. 2004-05-26 USACE Contract Special License Agreement (Ebner)
  100. 2004-07-19 TX 6-006-161 ITB Software Copyright  (Albright)
  101. 2004-07-10 Six-Degree of Freedom Sensor Fish Design (Deng et. al.)
  102. 2004-11-02 ANSI_IEEE_Std-1207 Excerpt (IEEE)
  103. 2005-04-15 Hydro Turbine Optimization
  104. 2005-06-01 Kaplan cam tuning procedure by Aleksandar Gajic et al.pdf
  105. 2005-06-01 Draft Best Practices WPXIV_HydroPerformanceProcesses_R8 (March et al)
  106. 2005-09-01_PIER_Research_on_Fish_Passage_at_California_Hydropower (CA Energy Commission Staff).pdf
  107. 2005-11-01 Evaluation of Blade-Strike Models of Kaplan Turbines (PNNL)
  108. 2005-11-30_Zeroing_Out_the_Messenger_(Harden).htm
  109. 2005-12-12 McNary Field Test (Wittinger)
  110. 2005-12-16_ITB_Field_Test_Data_Report.pdf
  111. 2006-01-16 McNary Field Test (Albright)
  112. 2006-01-25 HOT Meeting ITB Project Status.ppt (BPA)
  113. 2006-02-18_Kootenai_River_Letter_from_USDOI_to_USACE_HDC_and_DOE_BPA.html
  114. 2006-02-21 Ice Harbor Field Test (Ramirez)
  115. 2006-02-01 Ice Harbor data (Ramirez)
  116. 2006-03-22 IEEE 1147-2005 2006-03-22 Rehab powerplants.pdf
  117. 2006-06-01 Effects of Turbine Passage on Salmon at Wanapum (Cada et al) 
  118. 2006-06-01 Efforts to reduce mortality to Hydroelectric Turbine-Passed fish (Cada et al)
  119. 2006-06-01_Improving_Operations_On_The_Columbia_(Murphy)
  120. 2007-07-01 DOE Hydropower Program Biennial Report for   FY 2005-2006 
  121. 2006-07-01 Index Test Box Final Report uncirculated (Sheldon)
  122. 2006-07-31 Optimizing Dam Operations for Power and Fish (USACE, DOE)
  123. 2006-08-01_Kaplan_Example_(Hydro_Performance_Processes)
  124. 2006-09-01_Reduced_Spill_at_Hydropower_Dams_(Coutant_et_al)
  125. 2006-09-01_Index_Test_Box_Final_Report_from_HDC to HOT (Sheldon)
  126. 2006-09-19_WSJ_fish_kill (Fialca)
  127. 2006-09-29 A new Graphical Method to Reduce Turbine Index Test Data (Sheldon)
  128. 2007-01-30 Very Simple Kaplan Turbine Design (Ingram)
  129. 2007-07-01 Sensorfish-07-03399.pdf
  130. 2007-08-01 Biological Assessment of the Advanced Turbine Design at Wanapum Dam, 2005 (Dauble et al)
  131. 2007-11-01 Determining the Effect of Sher Stress on Fish Mortality during Turbine Passage (Cada et al)
  132. 2008-01-01 Northwest Hydro Operators Forum (BPA)
  133. 2008-03-01 Optimization of Hydro Power Plants (Cateni et al)
  134. 2008-05-05 NOAA Fisheries Biological Opinion Executive Summary.pdf
  135. 2008-06-01 Testing Time for Kaplans (Albright)
  136. 2008-06-13 Digital Governor Solicitation (HDC)
  137. 2008-06-13_Hydro_Review_AGCo_Contract_Award.html
  138. 2008-07-06 Optimizing Generating Efficiency of Entire Powerhouses (Sheldon)
  139. 2008-06-24 Winter_Kennedy_Flushing Solicitation for McNary W9127N-08-Q-0076
  140. 2008-08-03 IGHEM_Italy_Turbine_Upgrade_Efficiency_(Aldo Cateni et al)
  141. 2008-09-01 Award_in_Reno_(Sheldon_pg-13).pdf
  142. 2008-10-03 HOT_Meeting
  143. 2008-10-03 HOT_Meeting (annotated)
  144. 2009-06-14 Letter to BPA (Albright)
  145. 2009-08-14 Numerical Prediction of Vortex Rope in the Draft Tube (Lipej)
  146. 2009-12-01 Performance Testing of SHP Stations (Government of India)
  147. 2010-07-01 Efficiency_Testing-New_Method_to_Determine_Turbine_Absolute_Flow_and_Absolute_Efficiency_Data_(Sheldon).htm
  148. 2010-09-21 ITB_Product_Description.htm
  149. 2010-10-23 Improved WK Calibration Method (D.R. Topham)
  150. 2010-10-23 Kaplan_Optimization
  151. 2011-01-31 Optimization Tests of Classic Kaplan Turbines (A. Adamkowski)
  152. 2011-02-01 Turbine Survival Program (NWPCC)
  153. 2011-02-27 Turbine Survival Program.pdf (NWPCC)
  154. 2011-06-16 Hydro_Optimization_on_the Columbia (Allen)
  155. 2011-08-19 Optimizing multi-unit-powerhouses-a-new-method_(Parker et al)
  156. 2011-08-29 ORNL_Hydropower_Asset_Assessment_Project_(BSmith)
  157. 2011-09-01 Determining the Best Methods for Reducing Fish Mortality (Cada, Amaral)
  158. 2011-10-01 AQFlow_Flowmeter_Test_for_PTC-18
  159. 2011-11-02 Design Concept of Hydro Cascade Control System (V Fustek)
  160. 2011-12-06 Best_Practice_Catalog-Propeller-Kaplan_Turbine_(ORNL)
  161. 2012-01-01 GMS_Study_2012 (Taylor, Proulx & Lampa)
  162. 2012-01-01 Flow Measurement in Penstocks GMS_Study_2012.pdf
  163. 2012-01-01 Performance_Testing_20SHP_Stations_in_India (Dr. H.K. Verma)
  164. 2012-04-01 Method_to_Develop Cam  Curves From a Single Index Test (Sheldon)
  165. 2012-09-25 Northwest_Hydro_Operators_Forum_2012 Fall Program_(BPA)
  166. 2013-05-21 HOT_JOC_Brief (BPA)
  167. 2013-06-12 Optimizing Multi-Unit Powerhouses: Method to Compute Unit Selection and Load Sharing (Bass et al)
  168. 2013-09-16_TVA_Does_not_use_Sliding_Gate_FOIA response_email.html
  169. 2014-01-09 Selected Experiences with Optimization Tests of Kaplan Turbines (Adamkowski et al)
  170. 2016-05-16_BPA_FOIA
  171. 2016-07_Control_Design-How_to_Tune_PID_Loops-4_(Alex Barp)
  172. 2016-11-09_HOT_Meeting-DRAFT-SUMMARY
  173. 2017-01-16_The_Future_of_the_Columbia_River_System_Operations (CRSO)
  174. 2017-02-11_Simon's_NEPA_letter.docx

Resources
  1. Advanced (Fish-Friendly) Hydropower Turbine Design Development - Project 58.003 (EPRI)
  2. Alden Screw Turbine
  3. AE_Deriaz _turbine
  4. Book Reviews
  5. Chem Info
  6. Constant Power Testing
  7. Idaho National Laboratory Information Bridge - Hydropower Program: Advanced Turbine Systems (INL)
  8. Mica Dam, Columbia-Shuswap, BCV0A, Canada
  9. Northwest Power and Conservation Council Website
  10. Old Woodward.com
  11. Optimization (Sheldon)
  12. Pilot Valve Plate
  13. PJM Power Dispatcher Primer, part-01
  14. PJM Power Dispatcher Primer, part-02
  15. Session #5 Governor Adjustments (unknown)
  16. W.A.C.BennettDam, Hudson's Hope, BCV0C, Canada
  17. Water_Turbines_(Deriaz).pdf
  18. Woodward History Page
  19. Tools 3D+ ReadMe
  20. 3D+ Download
  21. Dorena Exe
  22. GBO_Grapher_Exe
  23. Clergue_Exe
  24. Francis_Exe

Description: Description: Description: http://www.countsponsor.com/count.php?id=629&cmd=img_only






style="color: windowtext; text-decoration: none;">
Description: Description: Description: free counters